Year 2012

In 2012 i was working on the second hull, again panels that were stitched together, were spread apart, bulkheads were inserted and stitched with the wire. After that, they were glued with thickened epoxy.


 

Great mes in the shed, i cant keep the order. 


In the spring I did in the garage one beam, i took  again stirodur as a model,

and than i covered it with glass fibers.


Stirodur is clearly seen on the top

This year we went on vacations to Pelješač town of Žuljana (Croatia). Here are some pictures and movie from sailing the small Haka









In Žuljana we met Gerry and Louise, Australian couple who sold everything back home , bought a 12 m catamaran (Fountaine Pajot), and went sailing. They are cruising around Mediterranean. We went together sailing, but it was not much wind that day. Gerry had built a Wharram TIKI  30 himself.





A nice photo of Haka in a quiet bay in Žuljana.

In autumn i glassed the hull, but again i have no pictures of it. With the help of the neighbors, we turned the hull, so it was ready for interior work.








0 komentarji:

Objavite komentar