Year 2015

During the spring, inside of the hull was painted.


With a little help of my.....


Front cabin.
 


Under the cabin floor.


 Painted cabin floor.

 Filing up stem and stern with styrodur.
 



Keel case in the middle part of the hull.





cabin side


laminated beam

quadroaxial cloth 1000 g

engine boxes in the back,


the same beam after further lamination, also one layer of carbon UD 360 g/m2, after that Quadroaxial fibers

engine box after lamination,



half finished second beam, waiting for further lamination,

front cabin with styrodur on the floor and laminated, toilet will come on the floor,

stairs  to into the cabin that will serve also as drawers,


worktop for the galley,



galley construction,










worktop painted for the first time, and construction of the shelves




painted outside and almost finished.


The hull is waiting to be mowed outside, i will move him to another place where i can put together both hulls.

0 komentarji:

Objavite komentar