First two pictures are taken on eight of February, they show the cabin When i glued the front and back side on the beginning i did a mistake. I simply changed the sides, and because the front beam and the back beam are not of the same height, i will have to backup in the front, so the cabin will be leveled.  Everything will be made from ply except the bottom. The bottom will be from styrodur and fiber.




Today i was working on the deck cabin again here are some pictures and a short movie.






In 1986 on the first of April I started with my three friends to build a Wharram catamaran Tiki 26. Unfortunately i don't have much pictures left from this time, but from the next years sailing from Pula to Dubrovnik and back are shown here.

Osor Behind
  
Between Island Cres and Lošinj, a colon of Elan 31  
 


Safe anchorage on Island Molat




 

A group of kayaks from Italy



Good morning

Morning toilet

Automatic flush toilet

Preparing lunch on the coast


Anchoring on island Žut


Islands of Kornati archipelago



A viev from island Kaprije

bay of Kaprije

Parcels with an olive tree, one fig tree, and vine on Kaprije

Adam searching for Eva



Both island Kaprije



Pakleni otoci near ilsand Hvar





Pelješac peninsula


Korčula the birth place of Venician Marko Polo




Town gates

A view from Polo's house

A monastery on nearbay island


Nice catch on island Mlijet

Nice south wind with waves

Dubrovnik

Small pier near hotel excelsior, Old city of Ragusa in the background






Today on the 5th of December, was a great day for me. Once again with the help of neighbors and friends we mowed catamaran on the new location

We gathered in the morning



Loading on the trailer went smooth without troubles 





First attempt failed, because Zetor was to light, so the second tractor had to hook the first one, and booth puled with ease weary synchronized.




We managed to pull him on the top, finally.





The new location, at last both hulls standing together




That's the approximate width of catamaran,

Front and back beam, front one is not finished yet.