APRIL the 3th

A cooler period came with the rain and yesterday on saturday the second of April it snowed, the temperatures were around zero. Today the rain and snow stopped, and it was wormer. The past week I was working on the middle cabin (or pod), and here are some pictures.


       
on the upper pictures are sides of the cabin already cut out



front of the cabin



bottom of the cabin glued from two pieces of  9 mm ply 
  
the entrance of the cabin

small tour around the cabin 


 

There has been quite some time since my last uploading , and a lot of things happened. Lover part of the hulls is glassed painted and turned round, the cabins are finished. 3 crossbeams will hold Catamaran together. All 3 are finished. Here are some pictures:

Laminated hulls


kell lamination



kell finished


turning the hulls


hulls painted and turned











Construction of the beam 




little bit confusing, but these is already the front beam which has oval shape 

above is ply cross, and styrodur on the sides, and
here the beam is already shaped, and the lamination will take place