During the spring, inside of the hull was painted.


With a little help of my.....


Front cabin.
 


Under the cabin floor.


 Painted cabin floor.

 Filing up stem and stern with styrodur.
 



Keel case in the middle part of the hull.





cabin side


laminated beam

quadroaxial cloth 1000 g

engine boxes in the back,


the same beam after further lamination, also one layer of carbon UD 360 g/m2, after that Quadroaxial fibers

engine box after lamination,



half finished second beam, waiting for further lamination,

front cabin with styrodur on the floor and laminated, toilet will come on the floor,

stairs  to into the cabin that will serve also as drawers,


worktop for the galley,



galley construction,










worktop painted for the first time, and construction of the shelves




painted outside and almost finished.


The hull is waiting to be mowed outside, i will move him to another place where i can put together both hulls.

Beam construction, prepared for lamination.


Beam after lamination, first part.

Now working on the second hull again.



It is nice to rest in the cabin, and imagine sailing, unfortunately steel a loot to do.

Storage beneath the floor, keel case in the lower right corner



Bulkheads were not made out of one piece, i didn't have the real plane, and i saved the ply.

Middle part that will stay opened





Front cabin with the roof.

Rear cabin side.

Stern.

Front cabin, outer side of the middle part that is opened.

Front cabin, door.

Inside of the back cabin.

Almost finished hull.



After completing the hull, we carried him out of the shed



The inside of the turned hull


Now the first hull that was standing out was brought in, and i started to pain him inside. this one will be in white.

Keel case